BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20180606T000000Z
DTEND:20180606T020000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:I-205 Widening & Seismic Improvements Open House
DESCRIPTION:The I-205 Widening and Seismic Improvement project will address congestion and traveler safety issues on a seven-mile stretch of I-205 between Stafford Road and OR 213. \n\n\n\nThe addition of a third lane in each direction from Stafford Road to OR 213 helps prevent bottlenecks that cause congestion and crashes\, which create delays for travelers and freight. Extending the I-205 northbound on-ramp across the Abernethy Bridge increases safety and travel-time predictability. Also\, seismically upgrading the Abernethy Bridge and replacing or retrofitting eight bridge sites in the project area ensures bridges can withstand a major earthquake. \n\n\n\nThe project continues to progress\, and some of the latest developments include:\n\n	OR 43 Interchange Design The project will remove the current I-205 northbound on-ramp from OR 43. Instead\, a new roundabout will provide the northbound access to I-205. \n	Noise Walls Analysis The project team is analyzing the potential need for noise walls at some locations in the project area. More information will be provided in the summer 2018.\n	Cost-to-Complete Report This report provides ODOT's plan to complete this project. The report was approved by the Oregon Transportation Commission and delivered to the Oregon Legislature in January 2018. Read the report at www.I205corridor.org/library\n	Open Houses and Online Open House Scheduled The project is hosting two open houses on June 5 in West Linn and on June 6 in Oregon City. Drop by to talk to the project team and learn more about the project. If you can't make it\, an online open house will be available from June 5 to June 22. \n\nLearn More
X-ALT-DESC;FMTTYPE=text/html:The I-205 Widening and Seismic Improvement project will address congestion and traveler safety issues on a seven-mile stretch of I-205 between Stafford Road and OR 213.&nbsp\;<br />\n<br />\nThe addition of a third lane in each direction from Stafford Road to OR 213 helps prevent bottlenecks that cause congestion and crashes\, which create delays for travelers and freight. Extending the I-205 northbound on-ramp across&nbsp\;the Abernethy Bridge increases safety and travel-time predictability. Also\, seismically upgrading the Abernethy&nbsp\;Bridge and replacing or retrofitting eight bridge sites in the project area ensures bridges can withstand a major earthquake.&nbsp\;<br />\n<br />\nThe project continues to progress\, and some of the latest developments include:\n<ul>\n	<li><strong>OR 43 Interchange Design&nbsp\;</strong>The project will remove the current I-205 northbound on-ramp from OR 43. Instead\, a new roundabout will provide the northbound access to I-205.&nbsp\;</li>\n	<li><strong>Noise Walls Analysis&nbsp\;</strong>The project team is analyzing the potential need for noise walls at some locations in the project area. More information will be provided in the summer 2018.</li>\n	<li><strong>Cost-to-Complete Report&nbsp\;</strong>This report provides ODOT&#39\;s plan to complete this project. The report was approved by the Oregon Transportation Commission and delivered to the Oregon Legislature in January 2018. Read the report at <a href="http://www.I205corridor.org/library">www.I205corridor.org/library</a></li>\n	<li><strong>Open Houses and Online Open House Scheduled&nbsp\;</strong>The project is hosting two open houses on June 5 in West Linn and on June 6 in Oregon City. Drop by to talk to the project team and learn more about the project. If you can&#39\;t make it\, an online open house will be available from June 5 to June 22.&nbsp\;</li>\n</ul>\n<a href="http://tualatinchamber.com/new/wp-content/uploads/SKM_C654e18060118330.pdf">Learn More</a>
LOCATION:Adult Community Center 1180 Rosemont Road West Linn\, OR 97068
UID:e.2305.9515
SEQUENCE:3
DTSTAMP:20260502T132824Z
URL:https://chamber.tualatinchamber.com/events/details/i-205-widening-seismic-improvements-open-house-9515
END:VEVENT

END:VCALENDAR
